Choosing a dumpster for a roofing project is not as simple as matching the size of the house to the size of the container.

Roofing debris is dense, roof systems vary significantly, and two houses with the same roof area can produce very different disposal loads.

A 25-square roof with one layer of standard asphalt shingles is different from a 25-square roof with two layers, damaged decking, wet material, or concrete tile.

That is why an effective roofing dumpster size calculator should consider more than square footage.

Bee Done Rentals provides 15-, 20-, 30-, and 40-yard roll-off dumpsters for qualifying roofing, construction, renovation, and commercial projects throughout San Antonio and Central Texas.

This guide gives roofing contractors, estimators, homeowners, and project managers a practical method for estimating roofing debris before ordering a roll-off.

Quick Roofing Dumpster Calculator

Start with four questions:

  1. How many roofing squares are being removed?
  2. How many existing layers are coming off?
  3. What type of roofing material is being removed?
  4. How much decking or additional material is expected?

Then use this basic formula:

Roof Squares × Number of Layers = Tear-Off Squares

Example:

25-square roof × 2 layers = 50 tear-off squares of roofing material.

That number gives you a much better starting point than simply saying the house is 2,500 square feet.

What Is a Roofing Square?

One roofing square represents approximately 100 square feet of roof surface.

For example:

  • 15 squares = approximately 1,500 square feet of roofing
  • 20 squares = approximately 2,000 square feet
  • 25 squares = approximately 2,500 square feet
  • 30 squares = approximately 3,000 square feet
  • 40 squares = approximately 4,000 square feet

However, do not assume the home’s floor area equals the roof area.

Roof pitch, overhangs, dormers, additions, garages, and roof geometry can increase the actual roofing surface.

If a roofing contractor has already measured the project, use the contractor’s roofing-square count rather than estimating from the home’s living area.

Step 1: Determine the Number of Roof Squares

The easiest source is usually the roofing estimate, takeoff, insurance scope, aerial measurement report, or contractor measurement.

Look for a number such as:

24 SQ

or

24 roofing squares

This is generally more useful for dumpster planning than the home’s advertised square footage.

Step 2: Determine How Many Roofing Layers Are Being Removed

The number of layers can dramatically affect disposal weight.

Compare:

25 squares × 1 layer = 25 tear-off squares

versus:

25 squares × 2 layers = 50 tear-off squares

The roof area has not changed, but the quantity of roofing material being removed has roughly doubled.

Older properties may have more than one roofing layer, so layer count should be confirmed before finalizing the waste plan.

Step 3: Identify the Roofing Material

Material type is one of the most important variables in roofing dumpster selection.

Common tear-off materials include:

  • Three-tab asphalt shingles
  • Architectural asphalt shingles
  • Premium or designer shingles
  • Wood shakes
  • Metal roofing
  • Concrete tile
  • Clay tile
  • Slate
  • Modified-bitumen roofing
  • Commercial roofing membrane systems

These materials have very different relationships between volume and weight.

Approximate Roofing Material Weight by Square

The following ranges are useful only for preliminary planning. Actual product weights vary by manufacturer, product line, age, moisture, installation method, and material attached during removal.

Roofing MaterialApproximate Planning Weight per Tear-Off SquarePlanning Concern
Three-tab asphalt shinglesRoughly 200–300 lb.Moderate to heavy
Architectural shinglesRoughly 250–400 lb.Heavy
Premium / designer shinglesCan exceed 400 lb.Heavy
Concrete / clay tileOften 800 lb. or moreExtremely heavy
SlateVery heavy; product dependentRequires specific planning
Metal roofingHighly system dependentVolume and long pieces can matter

These are estimating ranges—not guaranteed disposal weights.

When accurate product information is available, use actual manufacturer or project data instead.

Step 4: Estimate Shingle Weight

A basic planning calculation is:

Tear-Off Squares × Approximate Weight per Square = Estimated Roofing Debris Weight

For example, imagine a roof has:

  • 25 roofing squares
  • One layer
  • Architectural shingles estimated around 300 pounds per square

The rough calculation would be:

25 × 300 lb. = approximately 7,500 lb.

That is approximately 3.75 tons of shingles before accounting for:

  • Underlayment
  • Flashing
  • Nails
  • Drip edge
  • Damaged decking
  • Other roof-system debris

The calculation is intended for planning—not as a substitute for actual scale weight.

Roofing Dumpster Calculator Formula

Use this worksheet:

1. Roofing squares: ______

2. Existing layers: ______

3. Squares × layers = ______ tear-off squares

4. Approximate material weight per square = ______ lb.

5. Tear-off squares × weight per square = ______ estimated pounds

6. Divide estimated pounds by 2,000 = ______ estimated tons

Then add the additional project questions:

  • Will decking be removed?
  • Is the roofing wet?
  • Is tile, slate, masonry, or another dense material involved?
  • Will siding or other exterior debris be mixed into the load?
  • Will the project need one haul or planned swaps?

Those answers determine the actual dumpster strategy.

What Dumpster Size Do I Need for a Roof Tear-Off?

Bee Done Rentals currently offers 15-, 20-, 30-, and 40-yard roll-off dumpsters.

There is no universal rule assigning a specific number of roofing squares to each container because weight allowances, roofing materials, layers, decking, and project conditions vary.

However, this general framework can help start the conversation:

Dumpster SizePotential Roofing Application
15 YardSmaller tear-offs, repairs, focused roofing projects, or sites with limited placement space
20 YardModerate residential tear-offs and contractor roofing projects
30 YardLarger-volume tear-offs, multiple layers, decking work, or projects requiring additional debris capacity
40 YardHigh-volume bulky roofing or exterior project debris where material weight and site access support the container

This table is a planning framework, not a guaranteed capacity chart.

Weight can determine the service plan before physical dumpster volume does.

15 Yard Dumpster for Roofing

A 15-yard roll-off may be useful for:

  • Smaller residential roofs
  • Roofing repairs
  • Partial tear-offs
  • Garage roofs
  • Additions
  • Smaller reroof projects

The container’s smaller footprint can also help on residential properties with limited placement space.

However, roofing material is dense, so included weight and actual debris weight remain important.

For additional information, review the Bee Done Rentals 15 Yard Dumpster Guide.

20 Yard Dumpster for Roof Tear-Offs

A 20-yard dumpster may be a practical starting point for many moderate roofing projects.

Potential applications include:

  • Residential roof replacements
  • Single-layer asphalt tear-offs
  • Moderate roofing renovations
  • Roofing combined with limited decking removal

Do not select a 20-yard container simply because it is commonly associated with roofing.

Layer count and debris weight still need to be reviewed.

30 Yard Dumpster for Roofing Projects

A 30-yard dumpster provides additional physical volume for projects involving:

  • Larger roofs
  • Multiple roofing layers
  • Substantial decking replacement
  • Commercial roof work
  • Roofing plus other approved exterior debris

The extra space does not eliminate weight considerations.

A heavily loaded 30-yard dumpster can reach transportation constraints before it reaches the top of the container.

40 Yard Dumpster for Roofing

A 40-yard roll-off provides the greatest volume in Bee Done Rentals’ current lineup.

It can make sense for qualifying projects generating significant bulky debris.

However:

A 40-yard dumpster is not automatically the best roofing dumpster simply because it is the largest.

Dense roofing material may make a smaller container with planned swaps more appropriate.

Why Roofing Dumpsters Often Fill by Weight Before Volume

Roofing shingles stack relatively efficiently compared with furniture, cardboard, or bulky household debris.

That means the container may look as though it still has substantial room while already carrying considerable weight.

This is particularly important with:

  • Multiple shingle layers
  • Premium shingles
  • Wet roofing material
  • Tile
  • Slate
  • Substantial decking

For roofing, always think:

Weight + Volume

rather than volume alone.

How Do Multiple Layers Affect Dumpster Size?

Layer count is one of the fastest ways for a roofing estimate to go wrong.

Consider a 30-square roof:

One layer = 30 tear-off squares

Two layers = 60 tear-off squares

Three layers = 90 tear-off squares

The dumpster strategy may change considerably even though the roof dimensions remain identical.

Should I Automatically Get a Larger Dumpster for Two Layers?

Not necessarily.

Two layers increase debris, but the best solution may be:

  • A larger dumpster
  • A smaller dumpster with a planned exchange
  • Multiple containers

The decision depends on:

  • Weight
  • Dumpster availability
  • Site space
  • Crew production
  • Project duration
  • Service strategy

Decking Replacement Can Change the Estimate

Roofing estimates do not always know how much decking will need replacement until the tear-off begins.

Potential decking materials include:

  • Plywood
  • OSB
  • Older plank decking

A few damaged sheets may have limited impact.

Extensive decking replacement can add both volume and weight.

Roofers expecting significant deck replacement should account for it before selecting the container.

How Should You Estimate Unknown Decking Replacement?

If the exact amount is unknown, consider three scenarios during planning:

Low Decking Replacement

Only isolated damaged areas are expected.

Moderate Decking Replacement

Multiple sections may require replacement after tear-off.

Heavy Decking Replacement

The contractor expects significant deck deterioration or a broader re-deck.

This is more useful than pretending an exact number of damaged sheets can always be predicted before the roof is opened.

Wet Roofing Debris Weighs More

Rain and trapped moisture can increase disposal weight.

Materials affected can include:

  • Shingles
  • Underlayment
  • Decking
  • Insulation
  • Other roofing components

If tear-off debris becomes saturated, the actual load can weigh more than the original estimate.

This is another reason roofing calculations should be treated as planning estimates rather than guarantees.

Tile Roofing Requires a Different Dumpster Strategy

Concrete and clay tile are far denser than typical asphalt shingles.

A tile roof should not automatically use the same dumpster strategy as an asphalt-shingle roof with the same number of squares.

Tile tear-off may require:

  • A specific container
  • Reduced fill levels
  • Multiple hauls
  • A dedicated material load
  • Different disposal or recycling arrangements

Contact Bee Done Rentals before loading concrete or clay roofing tile.

What About Slate Roofing?

Slate is another heavy roofing material requiring project-specific planning.

Do not apply an asphalt-shingle calculator directly to slate.

The roofing contractor should provide:

  • Roof square count
  • Material type
  • Number of layers
  • Approximate tear-off scope

so the disposal strategy can be reviewed appropriately.

Metal Roofing Dumpster Planning

Metal roofing creates a different challenge.

The material may not be as dense as tile, but:

  • Panels can be long
  • Sharp edges require careful handling
  • Material can protrude if loaded improperly
  • Metal recovery may be available depending on condition and local outlets

All panels and metal components need to remain within the container walls for transport.

Discuss large metal-roofing projects before loading.

Commercial Flat-Roof Tear-Offs

Commercial roof systems can generate combinations of:

  • Roof membrane
  • Insulation
  • Cover board
  • Flashing
  • Metal
  • Roofing aggregate
  • Decking
  • Packaging

Because system construction varies widely, commercial roofing should be evaluated based on the actual assembly rather than using a residential asphalt-shingle calculator.

Large commercial projects may also benefit from scheduled swaps coordinated around roofing production.

Roof Tear-Off Example #1: Smaller Single-Layer Roof

Assume:

  • 18 roofing squares
  • One layer of asphalt shingles
  • Limited decking replacement

The project has:

18 × 1 = 18 tear-off squares.

A 15- or 20-yard service plan may be worth discussing depending on actual shingle weight, placement, included tonnage, and project conditions.

This is a starting point—not an automatic size assignment.

Roof Tear-Off Example #2: Moderate Architectural Shingle Roof

Assume:

  • 25 squares
  • One layer
  • Architectural shingles
  • Some decking expected

The project has:

25 tear-off squares plus decking and associated roofing debris.

A 20- or 30-yard strategy may be reviewed depending on actual product weight and service requirements.

Roof Tear-Off Example #3: Two-Layer Roof

Assume:

  • 25 roofing squares
  • Two layers

The project generates approximately:

25 × 2 = 50 tear-off squares.

This is where simply knowing that the house has a 25-square roof can badly underestimate waste.

A larger container or planned swap strategy should be evaluated based on weight and project conditions.

Roof Tear-Off Example #4: Tile Roof

Assume:

  • 20 roofing squares
  • Concrete tile

Do not take a standard 20-square asphalt-shingle recommendation and apply it to this project.

Tile is substantially denser and requires a project-specific heavy-material plan.

Contact Bee Done Rentals with the material and quantity before selecting the roll-off.

One Large Roofing Dumpster or Planned Swaps?

Roofing contractors should consider the entire service strategy.

A smaller dumpster with scheduled exchanges may work better when:

  • Driveway space is limited
  • Shingles are especially heavy
  • The project has multiple roofing layers
  • The roof is removed in sections
  • The property cannot accommodate a large roll-off
  • The crew produces debris quickly

Bee Done Rentals’ Construction Waste Solutions support scheduled swaps for qualifying roofing and contractor projects.

Dumpster Size vs. Included Tonnage

When comparing roofing dumpster quotes, ask about both:

Container size

and

Included material weight.

A larger physical container does not necessarily mean a proportionally larger included tonnage allowance.

For additional information about pricing and weight, review the Bee Done Rentals Dumpster Rental Cost Guide.

How Can Roofers Estimate Dumpster Cost More Accurately?

Include waste planning in the roofing estimate.

Record:

  • Roof squares
  • Number of layers
  • Roofing material
  • Expected decking replacement
  • Dumpster size
  • Included weight
  • Expected swaps
  • Project location

Over time, a roofing company can compare estimates against actual project results and improve disposal forecasting.

Build Roofing Waste Into the Estimate Template

A contractor estimate can include a simple internal section:

Roof Area: ______ SQ

Existing Layers: ______

Tear-Off Squares: ______

Roof Material: ______

Expected Decking: Low / Moderate / Heavy

Dumpster Plan: ______

Expected Swaps: ______

This creates repeatable waste planning across jobs.

Roofing Dumpster Placement Matters

The dumpster should support the crew without creating unnecessary problems for the homeowner or contractor.

The proposed placement should generally be:

  • Level
  • Accessible to the roll-off truck
  • Free from overhead obstructions
  • Property-approved
  • Accessible for future pickup or exchanges

Also consider:

  • Roof access
  • Driveway access
  • Garage access
  • Worker parking
  • Material delivery
  • Landscaping
  • Neighboring property

For a complete site-preparation guide, review the Bee Done Rentals Dumpster Delivery Guide.

Should Roofers Put the Dumpster Directly Under the Roof Edge?

Not automatically.

The most convenient loading position for the roofing crew may not always be the best position for the driveway, roll-off truck, landscaping, overhead utilities, garage access, or homeowner traffic.

Placement should be evaluated as a complete site decision.

Will a Roofing Dumpster Damage a Driveway?

No dumpster provider should guarantee that driveway damage is impossible.

Risk can depend on:

  • Driveway condition
  • Existing cracks
  • Surface type
  • Container weight
  • Roofing debris weight
  • Weather

Surface protection may be recommended depending on site conditions.

Discuss driveway concerns before delivery.

Do I Need a Permit for a Roofing Dumpster?

The key issue is where the dumpster will be placed.

A container located entirely on approved private property is different from one that occupies or affects a public street, sidewalk, parking area, or other public right-of-way.

If public right-of-way may be affected in San Antonio, verify applicable City requirements before delivery.

Review the Bee Done Rentals San Antonio Dumpster Permit Guide for more information.

What Roofing Materials Can Go in the Dumpster?

Approved roofing debris may potentially include:

  • Asphalt shingles
  • Underlayment
  • Approved decking
  • Flashing
  • Selected metal
  • Packaging
  • Other approved roof-system debris

Acceptance depends on material, weight, condition, contamination, and disposal requirements.

For detailed material guidance, review the Bee Done Rentals What Can Go in a Dumpster Guide.

Older Roofing Materials and Asbestos

Not all older roofing materials contain asbestos.

However, asbestos was historically used in certain roofing products.

Known or suspected asbestos-containing roofing should not be treated as ordinary roofing debris without appropriate evaluation.

Potential suspect materials may include certain older:

  • Roof shingles
  • Roofing felt
  • Cements
  • Coatings
  • Adhesives
  • Roof panels

You generally cannot determine whether a suspect material contains asbestos simply by looking at it.

If older material will be disturbed and asbestos is a concern, determine the applicable testing, removal, transportation, and disposal requirements before tear-off.

Commercial and Multifamily Roofing Require Additional Planning

Commercial, public, and multifamily projects can involve different asbestos and renovation requirements than a single homeowner replacing a residential roof.

Contractors should review project-specific requirements before demolition or tear-off.

Do not rely on a residential roofing rule for every building type.

Roofing Dumpster Housekeeping

A roll-off can support jobsite housekeeping by providing a central location for approved tear-off debris.

Roofing contractors should still maintain appropriate:

  • Work-area housekeeping
  • Debris removal
  • Walkway access
  • Fastener cleanup
  • Final property cleanup

A dumpster supports the cleanup process, but it does not by itself make a project compliant or hazard-free.

Nails and Roofing Debris Around the Dumpster

Shingles, fasteners, flashing, and wood debris can fall outside the container during tear-off.

Crews should periodically inspect:

  • The driveway
  • Walkways
  • Loading path
  • Areas around the roll-off
  • Final project area

Final cleanup may include magnetic sweeping and manual collection as appropriate to the contractor’s work procedures.

Do Not Overfill a Roofing Dumpster

Roofing debris needs to remain within the container’s allowable loading level.

Do not allow:

  • Shingles above the container walls
  • Decking protruding from the top
  • Metal hanging over the sides
  • Loose roofing debris extending beyond the container

If the dumpster reaches capacity, stop loading and request service.

Can Roofers Move the Dumpster With Their Equipment?

No.

Customers should not attempt to relocate a Bee Done Rentals roll-off with:

  • Trucks
  • Forklifts
  • Skid steers
  • Loaders
  • Other equipment

If the container needs to move, contact Bee Done Rentals so the new location can be reviewed and relocation can be properly coordinated.

Roofing Dumpster Checklist for Contractors

  • Confirm roof squares.
  • Confirm the number of existing layers.
  • Identify roofing material.
  • Estimate material weight.
  • Consider decking replacement.
  • Account for wet debris when applicable.
  • Identify tile, slate, concrete or other heavy materials.
  • Evaluate suspect older roofing materials before disturbance.
  • Choose a container based on both weight and volume.
  • Decide whether scheduled swaps will be required.
  • Select an appropriate placement area.
  • Confirm truck access.
  • Review public right-of-way requirements when applicable.
  • Keep debris inside the dumpster.
  • Coordinate final pickup after cleanup.

Roofing Dumpster Estimating Checklist

Before calling Bee Done Rentals, have the following information available:

  1. Project address
  2. Number of roofing squares
  3. Number of existing layers
  4. Roofing material
  5. Expected decking replacement
  6. Any tile, slate, concrete or heavy material
  7. Desired delivery date
  8. Expected tear-off schedule
  9. Proposed dumpster location
  10. Whether a container swap may be required

This gives the Bee Done team much more useful information than simply asking for “a roofing dumpster.”

Roofing Dumpster Size Calculator: Quick Decision Guide

Use this sequence:

Step 1: Get the roofing-square count.

Step 2: Multiply by the number of tear-off layers.

Step 3: Identify the roofing material.

Step 4: Estimate weight using actual product data or a reasonable planning range.

Step 5: Add decking and other expected debris.

Step 6: Determine whether weight or physical volume will likely control the load.

Step 7: Compare 15-, 20-, 30-, and 40-yard options.

Step 8: Decide whether one container or planned swaps make more sense.

Step 9: Confirm the final service plan with Bee Done Rentals.

Roofing Dumpster Rental in San Antonio From Bee Done Rentals

A good roofing waste estimate starts with the roof—not the dumpster.

Knowing the number of squares, roofing layers, material type, expected decking, and project schedule makes it much easier to create the appropriate container and hauling plan.

Bee Done Rentals works with roofing contractors, general contractors, builders, remodelers, property managers, homeowners, and commercial construction teams throughout San Antonio and Central Texas.

Our team can review:

  • Roof squares
  • Layer count
  • Roofing material
  • Dumpster size
  • Weight considerations
  • Decking debris
  • Placement
  • Scheduled swaps
  • Commercial roofing projects
  • Multi-building roofing projects

Need help sizing a dumpster for a San Antonio roofing project?

Contact Bee Done Rentals or call (210)834-1716 with the roof-square count, number of layers, roofing material, project address, and expected tear-off schedule.

You can also review our Roofing & Siding Contractor Dumpster Guide and Construction Waste Solutions for additional contractor resources.

Frequently Asked Questions About Roofing Dumpster Sizes

What size dumpster do I need for a roof tear-off?

The correct size depends on roof squares, number of layers, roofing material, debris weight, decking replacement, placement space, and whether planned swaps will be used. Bee Done Rentals offers 15-, 20-, 30-, and 40-yard roll-offs.

How do I calculate roofing debris?

Start by multiplying the number of roofing squares by the number of layers being removed. Then estimate material weight per square and add decking and other roofing debris.

What is one roofing square?

One roofing square represents approximately 100 square feet of roofing surface.

Does a 2,000 square foot house have a 20 square roof?

Not necessarily. Floor area and roof surface are different. Pitch, garages, overhangs, additions and roof geometry can increase roof area. Use the actual roofing measurement when available.

How much do asphalt shingles weigh?

Weight varies by product. As a rough planning range, three-tab shingles may fall around 200–300 pounds per square, while architectural products can often fall around 250–400 pounds or more. Use actual product information when available.

Do two roofing layers double the debris?

Two similar layers approximately double the tear-off roofing quantity compared with one layer over the same roof area, although underlayment, decking and other components can change the final load.

Is a 15 yard dumpster large enough for roofing?

It can be appropriate for smaller or focused roofing projects. Final selection should account for debris weight and roof scope rather than container volume alone.

Is a 20 yard dumpster good for roofing?

A 20-yard container can work for many moderate roofing projects, but it should not be treated as a universal roofing size. Roof squares, layers, material and decking should be reviewed first.

When should I use a 30 yard dumpster for roofing?

A 30-yard container may be appropriate for larger-volume tear-offs, multiple layers, substantial decking or other approved exterior debris, provided the expected weight is appropriate for the service plan.

Should I use a 40 yard dumpster for shingles?

Not automatically. Shingles are dense, so a 40-yard dumpster can encounter weight considerations well before all physical volume is used. A smaller container with scheduled swaps may sometimes be more appropriate.

Can roof shingles make a dumpster overweight?

Yes. Roofing shingles are dense, and multiple layers can generate significant weight before the container appears physically full.

Does wet roofing debris weigh more?

Yes. Shingles, decking, insulation and other materials can gain additional weight when wet.

Does decking count toward dumpster weight?

Yes. Removed plywood, OSB, plank decking and other approved wood debris add both weight and volume.

Can concrete roof tile go in a dumpster?

Concrete and clay tile require prior review because they are extremely dense. Specific containers, fill limits or multiple hauls may be required.

Can slate roofing go in a dumpster?

Slate requires project-specific heavy-material planning and should not use an asphalt-shingle sizing formula without adjustment.

Can metal roofing go in a roll-off dumpster?

Approved metal roofing may potentially be accepted depending on size, condition, weight and disposal requirements. Panels must remain within the container, and metal recovery may be available for some projects.

Can commercial roofing debris go in a dumpster?

Approved commercial roofing debris may potentially be handled through roll-off service, but roof systems vary widely. Membrane, insulation, cover board, aggregate, metal and other materials should be identified before sizing the service.

What if I discover more roofing layers after tear-off starts?

Contact Bee Done Rentals if the actual debris is substantially different from the original estimate. A different container, additional haul or scheduled exchange may be appropriate.

What if I discover extensive bad decking?

Reevaluate the remaining dumpster capacity and expected weight. Significant decking replacement can change both volume and total debris weight.

Should roofing contractors schedule dumpster swaps?

For high-volume or multi-layer tear-offs, planned exchanges may help keep waste service aligned with crew production and property constraints.

Can roofing shingles be recycled?

Potentially, depending on material, contamination, quantity and available receiving outlets. Do not assume every roofing load will automatically be recycled.

Can older roofing contain asbestos?

Some older roofing products may contain asbestos, although not all old roofing does. Suspect material should be evaluated before disturbance when asbestos is a concern.

Can I tell whether roofing contains asbestos by looking at it?

No. Visual inspection alone cannot reliably confirm asbestos content. Testing by an appropriate qualified laboratory is the reliable way to determine whether suspect material contains asbestos.

Do roofing dumpsters help with OSHA housekeeping?

A dumpster provides a central location for approved debris and can support jobsite housekeeping, but it does not by itself establish OSHA compliance. Contractors remain responsible for applicable work practices and site conditions.

How much does a roofing dumpster cost in San Antonio?

Cost depends on dumpster size, included weight, actual debris weight, rental duration, project location, number of hauls and roofing material. Request a project-specific quote for current pricing.

What information should I give Bee Done Rentals when ordering a roofing dumpster?

Provide the project address, roofing-square count, number of layers, material type, expected decking, desired delivery date, proposed placement area and anticipated project schedule.